At Allied Civil Services our management team share in over 20 years of experience, including on high profile works, including jobs such as Melbourne Citylink (Tullamarine Freeway Expansion and Widening), Frankston/Dandenong Road, Lathams Road, Craigieburn Road and Palmers Road Upgrades.
These experiences across a wide range of scopes, helps us to provide our clients with confidence in choosing a contractor with hands on knowledge.
We are proud to provide a short list of various works recently completed by Allied Civil Services.
- Removal and Installation of Work Zone, Bollard Installation and Removal, Profile and Paving of Asphalt Roadway ~70m2
- Asphalt Footpath Removal and Reinstatement ~135m2, Culvert Supply and Installation
- 15l/m Bluestone Kerb and Channel Modification and Installation (City Style Kerb Stone, 4x Row Pitcher Channel)
- Arrangement of Crane and Services, Provision of Traffic Management Services during Lifts
- Line Marking and Parking Space numbering across 3 basement levels (22 Car Spaces)
- Slab Cutting and Trenching, Drainage, Slab Infills and Shower Rebates, to engineering drawings, approximately 75m2
- Slab Infills, Excavation, Forming, Steelwork and Pour of Footings
- Scabbling and Slab Overlay (including Rebates, Set Downs etc)
- Site Preparation, Exposed Concrete Pour (~90m2), including Supply and Installation of Strip Drainage Channels
- Ceramic Paving/Tiling on Concrete Base ~25m2,
- Removal and Reinstatement of Concrete Entrance Ramp to new heights.
- Reinstatement of, 8.2l/m B2 Kerb and Channel, 10.5l/m B2 Kerb and Channel,
- Installation of new Pit, Lintel and Class D Lid, 19l/m pipe, Existing Pit Modification
- Redesign and Reinstatement of 21.5l/m B2 Kerb and Channel, including 2x Industrial Crossovers, and Pit Surround.
- Approximately 14l/m Sm2 Kerb and Channel Reinstatement
- Concrete Infill Behind Kerb using SL72 and N25 concrete ~14mx1.2m @250mm depth.
- Removal of Class B Lids, Modification Supply and Installation of 2 Class D Cast Iron Pits Lids.
- Rectify pooling in Channel, Reinstatement of 10.5 l/m B2 Kerb and Channel plus 5.6 × 2.5m Industrial Crossover.
- Performance Solution Provided: Removal and Modification of Pit Lid and Surround, Pit Cut Down to accept Grate in Channel, Modification and Reinstatement of 3.5l/m B2 Kerb and Channel.
- Provided traffic management with a TGS (generic/new) for this site, with a maximum of 3 traffic controllers, one side per day to allow thoroughfare to Heavy Vehicles.
- Reinstatement of 30 m² of Bluestone Roadway at Intersection, including Concrete Base Supply and Placement, Relaying of Stones and Flood Grouting.
- Onsite meeting and discussions with Client and affected Businesses and Residents to come up with project plan to minimise disturbances
- Reinstatement of ~250m2 Footpath, ~115m2 Industrial Crossovers, ~86L/m Kerb and Channel completed over 7 working days, including weekend work, in stages to minimise disruptions.
- Approximately 970m2 Carpark Development
- Supply and Set Up, Site Safety Devices such as Signage, Webbing, Safety Fencing and Bollards.
- Initial Site Layout and Mark Up, including Identification of Services
- Site Cut including Excavation, Cartage, Removal and Disposal of Material (350/400mm Depth) ~390m3
- Drainage Works including Trenching, Pit and Pipe Installation and Connection
- Sub-Base Stabilisation
- Base Preparation, including Supply, Cartage and Lay of Material ~290m3 to set Heights/Grades and Compaction to 98% Density
- Supply and Lay approximately 29L/m of Spoon Drain
- Supply and Lay of approximately 22L/m Concrete Edge Strip
- Remove and Reposition/Reinstate 13 Existing Wooden Bollards
- Construct approximately 45m2 New Footpath to Council Standards
- Construct approximately 30m2 Concrete Pad Infill
- Removal and Reinstatement of Gate, Reversing Orientation of Opening
- Prepare to Specifications, including preparation of Base, Formwork, Expansion Joints/Connolly’s, Pour and Finish 3x Laneways along with Multiple Crossovers, Pram Crossings and Foot Path Runs.
- Works Totalling approximately 600m2 Completed over the course of 6 working days.