Previous Works

  

At Allied Civil Services our management team share in over 20 years of experience, including on high profile works, including jobs such as Melbourne Citylink (Tullamarine Freeway Expansion and Widening), Frankston/Dandenong Road, Lathams Road, Craigieburn Road and Palmers Road Upgrades.
These experiences across a wide range of scopes, helps us to provide our clients with confidence in choosing a contractor with hands on knowledge.
 

We are proud to provide a short list of various works recently completed by Allied Civil Services.

    Smith / Moor Street, Fitzroy Project

    - Removal and Installation of Work Zone, Bollard Installation and Removal, Profile and Paving of Asphalt Roadway ~70m2
    - Asphalt Footpath Removal and Reinstatement ~135m2, Culvert Supply and Installation
    - 15l/m Bluestone Kerb and Channel Modification and Installation (City Style Kerb Stone, 4x Row Pitcher Channel)

    - Arrangement of Crane and Services, Provision of Traffic Management Services during Lifts  

    - Line Marking and Parking Space numbering across 3 basement levels (22 Car Spaces)

      Mecwacare, Malvern Project

       - Slab Cutting and Trenching, Drainage, Slab Infills and Shower Rebates, to engineering drawings, approximately 75m2 

        Woori Yallock Project

        - Slab Infills, Excavation, Forming, Steelwork and Pour of Footings
        - Scabbling and Slab Overlay (including Rebates, Set Downs etc)
        - Site Preparation, Exposed Concrete Pour (~90m2), including Supply and Installation of Strip Drainage Channels
        - Ceramic Paving/Tiling on Concrete Base ~25m2,
        - Removal and Reinstatement of Concrete Entrance Ramp to new heights.

          Heyington Avenue, Thomastown

          - Reinstatement of, 8.2l/m B2 Kerb and Channel, 10.5l/m B2 Kerb and Channel,
          - Installation of new Pit, Lintel and Class D Lid, 19l/m pipe, Existing Pit Modification
          - Redesign and Reinstatement of 21.5l/m B2 Kerb and Channel, including 2x Industrial Crossovers, and Pit Surround. 

            Industrial Avenue, Thomastown

            - Approximately 14l/m Sm2 Kerb and Channel Reinstatement
            - Concrete Infill Behind Kerb using SL72 and N25 concrete ~14mx1.2m @250mm depth.
            - Removal of Class B Lids, Modification Supply and Installation of 2 Class D Cast Iron Pits Lids.
            - Rectify pooling in Channel, Reinstatement of 10.5 l/m B2 Kerb and Channel plus 5.6 × 2.5m Industrial Crossover.
            - Performance Solution Provided: Removal and Modification of Pit Lid and Surround, Pit Cut Down to accept Grate in Channel, Modification and Reinstatement of 3.5l/m B2 Kerb and Channel.
            - Provided traffic management with a TGS (generic/new) for this site, with a maximum of 3 traffic controllers, one side per day to allow thoroughfare to Heavy Vehicles. 

              High Street and Highland Road Intersection, Thomastown

               - Reinstatement of 30 m² of Bluestone Roadway at Intersection, including Concrete Base Supply and Placement, Relaying of Stones and Flood Grouting. 

                Albert Street, Brunswick

                - Onsite meeting and discussions with Client and affected Businesses and Residents to come up with project plan to minimise disturbances
                - Reinstatement of ~250m2 Footpath, ~115m2 Industrial Crossovers, ~86L/m Kerb and Channel completed over 7 working days, including weekend work, in stages to minimise disruptions.  

                  Pitcher Park, Alphington

                  - Approximately 970m2 Carpark Development
                  - Supply and Set Up, Site Safety Devices such as Signage, Webbing, Safety Fencing and Bollards.
                  - Initial Site Layout and Mark Up, including Identification of Services
                  - Site Cut including Excavation, Cartage, Removal and Disposal of Material (350/400mm Depth) ~390m3
                  - Drainage Works including Trenching, Pit and Pipe Installation and Connection
                  - Sub-Base Stabilisation
                  - Base Preparation, including Supply, Cartage and Lay of Material ~290m3 to set Heights/Grades and Compaction to 98% Density
                  - Supply and Lay approximately 29L/m of Spoon Drain
                  - Supply and Lay of approximately 22L/m Concrete Edge Strip
                  - Remove and Reposition/Reinstate 13 Existing Wooden Bollards
                  - Construct approximately 45m2 New Footpath to Council Standards
                  - Construct approximately 30m2 Concrete Pad Infill
                  - Removal and Reinstatement of Gate, Reversing Orientation of Opening 

                    Peppercorn Hill Stage 3 and 4, Woodstock

                    - Prepare to Specifications, including preparation of Base, Formwork, Expansion Joints/Connolly’s, Pour and Finish 3x Laneways along with Multiple Crossovers, Pram Crossings and Foot Path Runs.
                    - Works Totalling approximately 600m2 Completed over the course of 6 working days. 

                      • Home
                      • Services
                      • About
                      • Previous Projects
                      • Products
                      • Contact
                      • Capability Statement

                      Allied Civil Services

                      Email: Info@alliedcivilservices.com.au

                      Ph: 0448322443

                      Copyright © 2026 Allied Civil Services - All Rights Reserved.

                      Powered by

                      This website uses cookies.

                      We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

                      Accept